by admin | May 16, 2013 | Uncategorized
We have recently completed the construction documents for the sealing structure of the openable roof of the Tele 2 Arena. The assignment has been carried out against PEAB. It has been a technically complex and challenging project to link together a large scale mechanical...
by admin | May 16, 2013 | Uncategorized
After a long period of intensive work, we have now delivered system documents for the Slussen project. The assignment has involved system design for all the hydraulic engineering of the facility, totalling around 260 tonnes of steel, as well as 3D visualisation of the facility in...
by admin | May 16, 2013 | Visualization
Tikab has created a Showreel for typical visualisation tasks. The film shows some projects in the near future. We have expanded and are looking for new business relationships and challenges. We perform technical visualization for primarily infrastructure, construction and industry. We use your...
Latest comments