Tikab, together with a number of major consultancies in a consultancy group led by ELU Konsult AB, has been given the very large and responsible assignment of designing the details and drawing up the construction documents for the New Slussen. Tikab has been given responsibility for the mechanical structures of the water part, such as sluice gates and spillway gates. All drainage hydraulics are included. In addition, Johan Stribeck fills the important position of VDC manager. Tikab will also support the project with 3D modelling and visualisation. This will be one of Tikab's biggest challenges ever!