by admin | Nov 26, 2013 | Visualization
New Slussen. A picture is worth a thousand words, a film worth a thousand images. Tikab supports with 3D visualization to describe technical challenges in the Land subproject.
by admin | Nov 26, 2013 | UAS |Drones
New Slussen. A picture is worth a thousand words, a film worth a thousand images. Tikab supports with 3D visualization to describe technical challenges in the subproject Water.
by admin | jul 18, 2013 | Uncategorized
Tikab, together with a number of major consultancies in a consultancy group led by ELU Konsult AB, has been given the very large and responsible assignment of designing the details and drawing up the construction documents for the New Slussen. Tikab has been given responsibility for the...
by admin | May 16, 2013 | Uncategorized
We have recently completed the construction documents for the sealing structure of the openable roof of the Tele 2 Arena. The assignment has been carried out against PEAB. It has been a technically complex and challenging project to link together a large scale mechanical...
by admin | May 16, 2013 | Uncategorized
After a long period of intensive work, we have now delivered system documents for the Slussen project. The assignment has involved system design for all the hydraulic engineering of the facility, totalling around 260 tonnes of steel, as well as 3D visualisation of the facility in...
by admin | May 16, 2013 | Visualization
Tikab has created a Showreel for typical visualisation tasks. The film shows some projects in the near future. We have expanded and are looking for new business relationships and challenges. We perform technical visualization for primarily infrastructure, construction and industry. We use your...
by admin | Jan 25, 2013 | Uncategorized
Tikab has delivered 3D animation for the teaser for SCA's Team in the Volvo Ocean Race. The purpose of the film is to present SCA's visual identity for the boat and crew. Tikab delivered the animation from storyboard. The delivery included three different passes Zdepth, MatID and...
by admin | Jan 18, 2013 | Uncategorized
Tikab has, among other things, carried out a thorough analysis of Vattenfall's largest spillway hatch in Stornorrfors.
by admin | Oct 18, 2012 | Uncategorized
Tikab has increased its staff by five people in a short time. New employees in each department: finance, calculation, construction and visualisation. Welcome Christina, Cecilia, Claes, Henrik and Göran!
by admin | Dec 18, 2011 | Uncategorized
We are looking for people with a Master's degree in engineering with interest and knowledge in strength science. You will work with static and dynamic strength analyses of pressure and force bearing steel structures mainly in the nuclear power industry. Previous experience in...
by admin | Jan 11, 2011 | Uncategorized
Our chamberlain is retiring and therefore we are now looking for an economist for a varied position. Read more here: Finance position at Tikab
Latest comments